What is the Preferred Schematic Report?
The Preferred Schematic Report (PSR) is a stage the project where the design team and community identify the single best option to meet the district’s educational and facility needs. It summarizes the options studied, explains why the chosen solution is preferred, and provides early site and floor plan concepts. The PSR also includes a preliminary budget and schedule, giving the Massachusetts School Building Authority and the community confidence to move the project into detailed design.
FEASIBILITY STUDY
Preferred Schematic Report
The Preferred Schematic Report (PSR) is a stage the project where the design team and community identify the single best option to meet the district’s educational and facility needs. It summarizes the options studied, explains why the chosen solution is preferred, and provides early site and floor plan concepts. The PSR also includes a preliminary budget and schedule, giving the Massachusetts School Building Authority and the community confidence to move the project into detailed design.
Resource Documents
Preliminary Design Program
The Preliminary Design Program (PDP) is an early-stage document that outlines the key needs, goals, and feasibility considerations for a proposed public building project. It serves as a foundation for future design and planning efforts, ensuring that community priorities, regulatory requirements, and budget constraints are considered before moving forward.
-
-
-
-
-
-
6 - Preliminary Evaluation of Alternatives
6.2 - Preliminary Options
-
7.1 - Local Actions & Approvals
-
A - Statement of Interest
B - Invitation to Conduct Feasibility Study
C - Design Enrollment Certificates
D - Educational Visioning Notes
E - Phase 1 ESA Report
F - Geotechnical Report
G - Traffic Report